It took me a bunch of pleading with the building super across the street, but I finally got to the roof, approximately 250 feet up, looking down on the excavation in progress at the site of the future Lucida. The final pit would be more than 50' below grade, and directly adjacent to the 4/5/6 subway tunnel directly to the west.
No comments:
Post a Comment